Operations
Match new quotes to real crew capacity
Use this crew-hour worksheet to check room for new work. Keep sold jobs, quote visits and office cover apart. Save a copy of your plan.
Work out usable crew time, subtract sold work and a real buffer, then check the hours needed for each new job. Keep all figures in the same unit. Open quotes are demand, not sold work.
Use your own job records. Another dealer’s install pace does not tell you what your crew can do next week. Try the sheet below, then read the steps to check your plan.
On this page
A plan you can use
Check your crew time
Pick one crew and one week. Use crew hours in each box. One crew hour means the whole crew works for one hour. Do not add each worker's hours.
The math runs on this page. No sign-in is needed.
Add your hours, or try the worked example.
Choose one clear unit
Use crew hours for one crew and one week. One crew hour means the whole crew works for one hour. Do not add each worker’s hours or mix hours with days.
Start with the hours the crew is at work. Take out leave, travel, training and other booked work. Keep some time free for jobs that run long.
Show the available time
Use checked job plans for work already sold. Do not fill every open slot with a best-case estimate. The site lead should review unusual jobs.
The example below shows the method only. Its hours are made up and are not a target for your team.
Keep quotes out of the sold row
An open quote may become work, but it is not yet an accepted job. Show quote demand beside the crew plan rather than booking it all as sold.
Agree who moves a job into the sold row. Check the scope, acceptance and ready steps first. Record changes as they happen.
- Hours available.
- Hours already committed.
- Buffer kept.
- Hours still open.
- New job hours checked.
Check the limit outside the crew sheet too
A free crew slot is not the only part of capacity. A quote visit needs a sales slot. A new lead needs office cover. A job may also need parts or another trade.
A full install week does not always mean stop taking quote requests. Sales can discuss later work if it gives truthful dates. Label a possible future slot as possible, not booked.
Use the sheet with sales
Give sales the next dates the team can fairly discuss. Be clear when a date is only a possible slot.
Review the sheet when a job runs long or a crew member is away. A full install plan may also leave room for quotes for later work. Match the promise to the real limit rather than stopping every inquiry.
Check the parts before you fill a crew slot
SwiftSocial and Generator Stands LLC are marketing partners. We help generator firms plan their ads and sales. Generator Stands makes stands for installs. Its site also points installers to SwiftSocial.
For your next job, check more than the space on the crew sheet. Who will check the unit, stand and site? Ask the supplier for the drawings you need. Ask when the parts can arrive. A web page alone does not show that a part fits your job.
Keep one person in charge of each open step. That may be a call to the supplier, a site check or a plan for another trade. Give each step a due date. Tell the office when it is done.
Mark dates as set, planned or still unknown. If you still need a key part or check, do not set the install date. Tell the buyer when the next update is due. Do not fill a crew slot with a promise the team cannot keep.
This is SwiftSocial's guide to planning work. Your supplier and trained job team must check part fit and site needs. Use their answers to update the sheet before you take on more work.
Watch and learn
Let crew capacity set the pace
Tyler describes holding ads while his team caught up. Work out the space in your own schedule before adding more demand.
Selected section: 2:23–3:05.
This is a clip from an earlier client interview. The speaker shares their own results and views. It is not an audit or a forecast for your firm. The full video may mention old offers.
Loading this video connects to YouTube. The player stays off until you choose to load it.
Sources and further reading
Sources checked .